RegOpsPro™

Inspection Readiness Scorecard

Assess whether your GDP system is genuinely inspection-ready: score the core control areas, identify evidence gaps and generate a focused readiness position for internal preparation.

20–30 minutesSaved locally in this browser

What should I prepare?
Good readiness inputs look like this. Capture whether evidence is retrievable, current, owned and explainable. Avoid simply marking a control as present. Note where records exist but are hard to find, where procedures are current but not embedded, or where owners cannot explain the process confidently.
Data and QMS boundary
Local-only tool. Entries stay in this browser. No AI processing. No database save. Transfer agreed actions into your inspection readiness plan, governance pack or QMS as appropriate.
Method and output
Example data expectation. Example data should reflect a credible pre-inspection position: some controls inspection-ready, some amber gaps, named weak areas and practical preparation actions that can be transferred into the QMS or inspection readiness plan.
Method boundary. Readiness scores and bands are a RegOpsPro preparation framework, not an MHRA inspection rating or assurance of regulatory compliance.

How to use the scorecard

Work through a guided readiness workflow rather than a cramped input panel. Estimated completion time is 20–30 minutes depending on evidence depth.

  • Scope: 3–5 min to define site and assessment boundary.
  • Scoring: 10–15 min to score GDP readiness controls.
  • Governance report review: 5–7 min to review priority gaps and actions.
  • Export: 2–3 min to copy, print or transfer outputs.

How to interpret the output

The scorecard converts individual control-area scores into an overall readiness band, recommended preparation priorities and a QMS-transfer summary for action tracking and internal review.

  • Not inspection-ready: major preparation gaps remain.
  • Significant preparation required: core controls or evidence need work.
  • Targeted preparation required: selected gaps need closure before inspection.
  • Inspection-ready: evidence is broadly organised and explainable.

Inspection Readiness Scorecard Workspace

Step 1 of 4 — Scope

0% completeDefine scope · 3–5 min
Not saved yet.
Local draft only. Nothing is submitted, stored or reviewed by RegOpsPro.
Output status: Treat generated outputs as draft governance material for internal review. Confirm evidence, ownership, dates and QMS references before transferring into controlled records.